13/10/2017 08:36:00

443 metres "Net Oil Pay" - Lidsey-X2 Production Well

Doriemus PLC - 443 metres "Net Oil Pay" - Lidsey-X2 Production Well

PR Newswire

13 October 2017

Doriemus Plc

("Doriemus" or the "Company")

443 metres “Net Oil Pay” -  Lidsey-X2 Production Well

Doriemus plc (Listed in Australia ASX:DOR and listed in London NEX:DOR) (“Doriemus” or the “Company”), is pleased to provide an update on the drilling of its new Lidsey-X2 production well at the Lidsey Oil Field, located at the southern edge of the UK’s onshore Weald Basin, south of London.

Highlights:

  • Lidsey-X2 production well has reached its planned TD of 1,700m Measured Depth.

  • 443m of “net oil pay” to be produced from the Greater Oolite limestone reservoir.

  • The 5” slotted production liner has been successfully installed.

  • Following de-mobilisation of the BDF-28 drilling rig, the Lidsey-X2 well will be placed into production.

  • Planning permission in place for a third well at the site.

  • Drilling also intersected 66m in the Kimmeridge and 105m in the Oxford, which are now being evaluated.

  • Upgrade of surface facilities at Lidsey to efficiently and safely managage all future production.

David Lenigas, Doriemus Plc’s Executive Chairman, commented;

“This is an excellent result for Doriemus and it’s shareholders. The drilling of the Lidsey-X2 production well has gone like clockwork, and we are pleased to report that the Company’s first new oil production revenues are not far away, with the Lidsey-X2 well preparing to bring on line 443m of net oil pay from the Greater Oolite conventional limestone reservoir. We are also encouraged that the Lidsey-X2 well site offers scope for further developments with the potential extention of the Greater Oolite reservoir horizon and the prospects of further oil zones being identified within the Kimmeridge and Oxford layers which are now being analysed post drilling.”

The operators of the Lidsey Oil Field, Angus Energy Plc, have advised that:

“Angus Energy is pleased to announce it has successfully completed the drilling of the Lidsey-X2 production well.

The Company will produce from a “net oil pay” section of 443 metres (“m”) from the Great Oolite limestone reservoir. The production reservoir section has a Measured Depth (“MD”) of 1,230-1,673m.  True Vertical Depth (“TVD”) of the production section is measured to be 994.9m-1,009.3m.

The well reached its Total Depth (“TD”) objective at 1,700m and the slotted oil production liner has been installed. Following de-mobilisation of the BDF-28 drilling rig, the Lidsey-X2 well will be placed into production.

The well was drilled on time and on budget as outlined in previous Company guidance.

Towards the end of the horizontal section of the Great Oolite reservoir, initial analysis by the Company showed an unexpected change in the lithology of the well. The lithological change indicates a potential extension, continuing to the west of the original reservoir. This entirely new and separate section of the Great Oolite reservoir would be at original conditions as it has never been produced. Further analysis will be undertaken to reach a final determination. The Company will update the market in due course.

Drilling to the Great Oolite reservoir, the primary well objective, the Lidsey-X2 well passed through two additional potential production resevoirs, the Kimmeridge and the Oxford Clay source rocks. Both are positioned above the Great Oolite.

The Kimmeridge was encountered between 782.3m-862.4m MD (with a true vertical thickness of 66.2m). The layers in the well consisted of a mixed series of shales and limestones typical of the formation in the Weald Basin. Natural fractures appear to be present but further detailed analysis of the image logging will be undertaken to quantify this. Samples have now been sent for geochemical analysis to verify if this section has seen pressures and temperatures in the past needed to generate oil in commercial quantities.

The Oxford Clay was found between 920.8m-1179.5m MD (with a true vertical thickness of 105.0m). The Oxford Clay is a potential oil source rock and has oil production potential where mature. The British Geological Society (“BGS”) reported Oxford Clay has “potential where mature (Ro > 0.6%), especially in lower parts and where free oil exists (perhaps limited to sweet-spots)”.  As part of the above mentioned geochemical analysis, Angus Energy has also sent samples for further examination to ascertain whether the drilled section conforms with the previous BGS findings.

The Company notes it has planning permission for a third well at the site and can convert the existing Lidsey-X1 well into a water injector if required.

The Lidsey Oil Field is located on-shore at the southern edge of the Weald Basin, near Bognor Regis.”

About the Lidsey Production Oil Field and Doriemius Plc’s Interest:

The Lidsey Oil Field is 5.3km2 in size and located in the southern portion of the onshore UK Weald Basin in West Sussex south of London and next to Bognor Regis on the south coast of England.

Doriemus Plc owns a 30% direct participating working interest in the Lidsey-X2 production well, which is located within the onshore Lidsey Oil Field (PL 241)(Production Licence) under the rights it has under the 21 November 2013 Farm-Out Agreement. The Lidsey Oil Field is operated by Angus Energy Plc. In respect of all other wells on the Lidsey Oil Field, Doriemius has a 20% participating interest and contribution to capital costs will be 20%.

COMPETENT PERSONS STATEMENT:

Pursuant to the requirements of the ASX Listing Rules Chapter 5 in Australia and the NEX Rules in the United Kingdom for Companies, the technical information and resource reporting contained in this announcement was prepared by, or under the supervision of, Mr Gregory Lee, who is the Technical Director of the Company. Mr Lee has more than 30 years' diversified experience in the petroleum industry.  Mr Lee is a chartered professional Engineer (CPEng) and a member of the society of petroleum engineers (MSPE) and has been an independent consultant Petroleum Engineer since 1992 and has sufficient experience in exploration for, appraisal and development, operations of oil and gas resources.

The directors of the Company accept responsibility for the contents of this announcement.

CONTACTS:

For further information on this update or the Company generally, please visit our website at

www.doriemus.co.uk or contact:

Doriemus Plc

UK Contacts:

David Lenigas (Executive Chairman)                                                                         +44 (0) 20 7440 0640

Greg Lee (Technical Director)                                                                                    

Australia Contacts:

Julia Beckett (Joint Company Secretary)                                                            +61 (08) 6141 3500

Email: julia.beckett@wolfstargroup.com.au

UK Advisors:

Peterhouse Corporate Finance Limited                                                                 +44 (0) 20 7469 0930

Guy Miller

Fungai Ndoro

Technical Glossary:

BGS: The British Geological Survey is a world-leading geological survey. It focuses on public-good science for government, and research to understand earth and environmental processes.

MD & TVD: Measured depth (MD) is the length of the borehole. In conventional vertical wells, this coincides with the true vertical depth (TVD) of the borehole as measured from the surface in a straight line, but in directional or horizontal wells, like Lidsey-X2 these two can deviate significantly.

TD: Total Depth (TD) is the depth of the bottom of the well. Usually, it is the depth where drilling has stopped.

Ro: Vitrinite reflectance data is presented in units of %Ro, the measured percentage of reflected light from a sample which is immersed in oil (%Ro = % reflectance in oil).

FORWARD LOOKING STATEMENTS AND IMPORTANT NOTICE:

This document may contain forward looking statements that are subject to risk factors associated with the oil and gas industry. It is believed that the expectations reflected in these statements are reasonable, but they may be affected by many variables which could cause actual results or trends to differ materially.

Investors should make and rely upon their own enquiries before deciding to acquire or deal in the Company’s securities.

This report contains forecasts, projections and forward looking information.  Although the Company believes that its expectations, estimates and forecast outcomes are based on reasonable assumptions it can give no assurance that these will be achieved.  Expectations, estimates and projections and information provided by the Company are not a guarantee of future performance and involve unknown risks and uncertainties, many of which are out of the Company’s control.  Actual results and developments will almost certainly differ materially from those expressed or implied. The Company has not audited or investigated the accuracy or completeness of the information, statements and opinions contained in this report.  To the maximum extent permitted by applicable laws, the Company makes no representation and can give no assurance, guarantee or warranty, express or implied, as to, and takes no responsibility and assumes no liability for (1) the authenticity, validity, accuracy, suitability or completeness of, or any errors in or omission from, any information, statement or opinion contained in this report and (2) without prejudice to the generality of the foregoing, the achievement or accuracy of any forecasts, projections or other forward looking information contained or referred to in this report.

Post comment

Related debate

  • 1 week
  • 1 month
  • 1 Year
18 Aug
PNDORA
Foerst den ene vej 📈 og saa den anden vej 📉 og tju og tju og skomagerdreng... 🎶 Jeg er helt overb..
29
14 Aug
VELO
Vi har diskuteret markedet for immunosuppressive medikamenter før, og jeg har i et tidligere indlæg ..
23
16 Aug
GEN
Det er interimdata vi venter på og altså ikke det fulde data sæt - kigger vi på de tre andre fase II..
19
17 Aug
VELO
Q2-18 er udkommet og jeg har fået set lidt på regnskabet. Overordnet set fulgte selskabets resultat ..
18
15 Aug
VELO
Bare t.o. Jeg taler efter planen med Craig Collard i eftermiddag og sender en artikel ud i morgen.  ..
18
13 Aug
VELO
Husk at markedet er gigantisk! Astellas' to produkter AstagrafXL og Prograf solgte for ca. 12 mia. k..
18
15 Aug
 
Endnu et fantast firma på First North...og denne gang med det flatterende navn Hypefactor...   Når m..
16
13 Aug
VELO
Dette er på alle måder et super regnskab. jeg er helt enig med dem der forventer endnu en opjusterin..
16
13 Aug
PNDORA
22,8 mia. kr. i 2017 synes smykkerne var pæne. det tæller mere end din ene mening
16
14 Aug
VELO
Svar fra Kevin Grønnemann, Medwatch.....   Mange tak for din mail og for jeres forslag.   Det er nog..
14

HSBC Bank Plc : Form 8.5 (EPT/RI) - Lonmin PLC

22/02/2018 10:54:53
FORM 8.5 EPT/RI) PUBLIC DEALING DISCLOSURE BY AN EXEMPT PRINCIPAL TRADER WITH RECOGNISED INTERMEDIARY STATUS DEALING IN A CLIENT-SERVING CAPACITY Rule 8.5 of the Takeover Code (the "Code") 1.         KEY INFORMATION (a) Name of exempt principal trader: HSBC BANK PLC (b) Name of offeror/offeree i..

Rathbone Brothers Plc : Preliminary announcement of 2017 results

22/02/2018 07:00:19
Funds under management up 14.3% to £39.1 billionThis is a preliminary statement of annual results published in accordance with FCA Listing Rule 9.7A. It covers the year ended 31 December 2017. Mark Nicholls, Chairman of Rathbone Brothers Plc, said: "UK and global investment markets performed well in 2017, with some indices reaching record levels towards the end of the year. This outcome has b..

Elliott Capital Advisors, L.P : Form 8.3 - GKN Plc

Related news
21/02/2018 15:25:10
FORM 8.3 PUBLIC OPENING POSITION DISCLOSURE/DEALING DISCLOSURE BY A PERSON WITH INTERESTS IN RELEVANT SECURITIES REPRESENTING 1% OR MORE Rule 8.3 of the Takeover Code (the "Code") 1.         KEY INFORMATION (a) Full name of discloser: Elliott Capital Advisors, L.P. (for itself and related general partners ..

Most read news

  • 24 hours
  • 48 hours
  • 1 week
1
Sophos Sweeps Network and Endpoint Security Categories in CRN’s 2018 Annual Report Card – Again!
2
SHAREHOLDER ALERT: FIZZ ACAD FB ABBV TTPH RMTI HMNY GDS NLSN ZN SBGI ORCL: The Law Offices of Vincent Wong Reminds Investors of Important Class Action Deadlines
3
SHAREHOLDER ALERT: MRCY GLCNF GLNCY MD COOL HAIR FPI SBGL NWL GOGO FLKS: The Law Offices of Vincent Wong Reminds Investors of Important Class Action Deadlines
4
Key Energy Services Announces Appointment of Rob Saltiel as New President and Chief Executive Officer
5
AC Immune Announces Important Clinical Milestones for ACI-24 Vaccine in Alzheimer's Disease and Down Syndrome

Buy and sell signals

  • Trend
  • Moneymachine

Copyright Euroinvestor A/S 2018   Disclaimer and Terms of Use
Quote information is delivered by Morningstar.
Data is delayed 15-20 minutes according to the distribution agreements set by the different exchanges.
 
20 August 2018 13:31:38
(UTC+00:00) Dublin, Edinburgh, Lisbon, London
Version: LiveBranchBuild_20180816.1 - EUROWEB6 - 2018-08-20 14:31:38 - 2018-08-20 13:31:38 - 1000 - Website: OKAY